I had a long chat with Ian on friday but all he would say about current drilling program is that the first assay results should be out in 7 -10 days.
They are currently drilling hole 15 which makes it 8 holes in this campaign. This will likely be the last drill hole for now.
The encouraging part is that many of these holes were drilled under hole 9. This tells me (my words only) that they saw something interesting in hole 9 and decided to explore deeper in that area.
Personally i am very encouraged by this news,although Ian would not confirm any visual results.
Remember that the fall drill program consisted of 7 drill holes all of which contained MMS and all had low grade cu/ni. None of the holes exceeded 100 meters. Since then they have done crone downhole work and located the better targets. Now they are drilling them at depth.
SN