The rains have quit and the waters have receded, time for some drillin!
Having a minable limestone deposit on the property will definitely reduce production operating costs.
4 drills going at it deposits at surface, drilling shouldn't take long. Soon we'll have a huge upgraded "Measured and Indicated" Verdete resource and a new 43-101 on the phosphate resource.
good stuff boys and girls. good stuff.
Very happy to be on this express train.