Gold Production in Mexico

Targeting 2013 annual production of 118,000 ounces of gold

Free
Message: Henk Krasenberg, European Gold Centre (3/11/13)

Henk Krasenberg, European Gold Centre (3/11/13) "Timmins Gold Corp.'s exploration activities continue at an impressive level; for 2013, an extensive 200,000m drilling program is underway to expand the deposit in all directions around and beneath the main pit with significant regional exploration. Expanding the existing gold reserve of 1.33 Moz (72.3 Mmt at 0.572 g/t gold) is one of the objectives for 2013; I am very positive about the quality growth that this quality gold producer will continue to realize."

Share
New Message
Please login to post a reply