Message: Mine Update November 14 timmins Gold Corp
Timmins Gold Corp. - San Francisco Mine Progress Report


-- Posted Friday, 14 November 2008 | Digg This Article | Source: GoldSeek.com



TSX-V:TMM

Timmins Gold Corp is pleased to report on the progress of the startup of the San Francisco Mine. Things are progressing rapidly. The primary crusher is on its way to operation, the secondary and tertiary crushers are being installed, and the heap leach pads are being constructed. The gold plant is refurbished and ready to pour gold.

San Francisco Pit


Test Blasting at Pit



Crushing area - primary crusher in middle with secondary and tertiary crushers and conveyors in the foreground.
Pit in background



Primary crusher is almost operational


Secondary and tertiary crushers


New crusher pad being prepared for concrete


Mine manager Alfredo Barraza inspects new conveyors


New heap leach pads under construction


100 tonne Caterpillar trucks being assembled at mine


Refurbishment of ADR Gold Plant complete

Additional Resources:

Timmins CEO, Bruce Bragagnolo & Chris Waltzek - April 29, 2008

Website: http://www.timminsgold.com/

This News Release contains forward-looking statements. Forward-looking statements are statements which relate to future events. In some cases, you can identify forward-looking statements by terminology such as "may", "should", "expects", "plans, "anticipates", believes", "estimates", "predicts", "potential", or "continue" or the negative of these terms or other comparable terminology. These statements are only predictions and involve known and unknown risks, uncertainties and other factors that may cause our or our industry's actual results, level of activity, performance or achievements to be materially different from any future results, levels of activity, performance, or achievements expressed or implied by these forward-looking statements.

While these forward-looking statements, and any assumptions upon which they are based, are made in good faith and reflect out current judgment regarding the direction of our business, actual results will almost always vary, sometimes materially, from any estimates, predictions, projections, assumptions or other future performance suggestions herein. Except as required by applicable law, Timmins Gold does not intend to update any forward-looking statements to conform these statements to actual results.


The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.


Contact:

Contacts:

Timmins Gold Corp.

Bruce Bragagnolo, LLB.

Chief Executive Officer

(604) 638-8980

Email:

bruce@timminsgold.com



Timmins Gold Corp.

Arturo Bonillas, B.Sc.(Eng)

President

011-52-662-262-1132

Email:

arturo@timminsgold.com



Timmins Gold Corp. - Investor Relations

Leighton Bocking

Corporate Development

(604) 638-8977

Email:

leighton@timminsgold.com



Timmins Gold Corp. - Investor Relations

Alex Tsakumis

Corporate Development

(604) 638-8976

Email:

alex@timminsgold.com





Source: Timmins Gold Corp.


-- Posted Friday, 14 November 2008 | Digg This Article | Source: GoldSeek.com



Previous Featured Press Releases










news.goldseek.com >> Story

E-mail Page | Print | Disclaimer



© 1995 - 2008


© GoldSeek.com, Gold Seek LLC


The content on this site is protected by U.S. and international copyright laws and is the property of GoldSeek.com and/or the providers of the content under license. By "content" we mean any information, mode of expression, or other materials and services found on GoldSeek.com. This includes editorials, news, our writings, graphics, and any and all other features found on the site. Please contact us for any further information.

Share
New Message
Please login to post a reply