Fire River Gold Reports 37 g/t Gold Over 3.6 m
posted on
Nov 23, 2010 10:06AM
Fire River Gold reported the first results obtained from the 28,000 metre drill program at the Nixon Fork Gold Mine situated in Alaska's Tintina Gold Belt. A total of 6,700 metres have been drilled to date of which 2,400 metres were on surface. The Company has received assay results from 16 of the 19 surface drill holes.
Highlights
"These first results from our surface drilling program are encouraging," commented Richard Goodwin, VP Mining of Fire River Gold. "They demonstrate the occurrence of high grade mineralization outside of the Crystal and Mystery Mines and affirm the possibility of extending operations by continuously replacing depleted mines with new ones through ongoing exploration."