This Stock with only 22MS is on Quite a Roll recently!
posted on
Aug 18, 2014 12:17PM
We may not make much money, but we sure have a lot of fun!
Press release from CNW Group
Monday, August 18, 2014
Shares Issued and Outstanding: 22,857,675
TSX-V: KDI
TORONTO, Aug. 18, 2014 /CNW/ - Kennady Diamonds Inc. ("Kennady Diamonds", the "Company") (TSX-V: KDI) is pleased to announce the latest results from the 2014 summer drill program at the Company's 100 percent controlled Kennady North diamond project located in Canada's Northwest Territories. Exploration, delineation and mini-bulk sample drilling is currently underway at the Kelvin kimberlite.
Kennady Diamonds CEO Patrick Evans noted: "Delineation drilling at the north lobe of the Kelvin kimberlite pipe is exceeding expectations and initial exploration drilling at the Kelvin dyke is returning promising kimberlite intersects. Based on the results to date, we have revised our tonnage estimate for the Kelvin – Faraday kimberlite corridor from the previous 5 to 8 million tonnes to 7 to 10 million tonnes".
Table 1 below provides details of the latest mini-bulk sample holes drilled at the Kelvin kimberlite.
Table 1
Kelvin 2014 Summer Mini-Bulk Sample Drill Program
Drill Hole |
Target |
Azimuth |
Inclination |
Kimberlite Intercepts (m) |
End of |
||
From |
To |
Intercept |
|||||
KDI-14HQ-024b |
Kelvin |
295 |
-90 |
59.30 |
137.30* |
74.10 |
142 |
KDI-14HQ-025a |
Kelvin |
295 |
-80 |
57.50 |
153.00 |
95.50 |
157 |
KDI-14HQ-025b |
Kelvin |
295 |
-90 |
60.60 |
135.00* |
72.20 |
145 |
KDI-14HQ-026b |
Kelvin |
295 |
-90 |
72.60 |
163.00* |
89.00 |
170 |
KDI-14HQ-027b |
Kelvin |
295 |
-90 |
61.00 |
163.00* |
100.20 |
169 |
KDI-14HQ-028a |
Kelvin |
355 |
-80 |
73.10 |
212.00* |
131.60 |
220 |
KDI-14HQ-028b |
Kelvin |
355 |
-90 |
63.10 |
188.00* |
123.60 |
196 |
KDI-14HQ-029a |
Kelvin |
355 |
-80 |
68.50 |
205.50* |
108.80 |
217 |
*Includes minor country rock intercepts
**Intersects in sub-vertical holes not true widths
Table 2 below provides details of the latest delineation holes drilled diagonally across the north/northwest lobe of the elongated Kelvin kimberlite pipe.
Table 2
Kelvin 2014 Summer Delineation Drill Program
Drill Hole |
Target |
Azimuth |
Inclination |
Kimberlite Intercepts (m) |
End of |
||
From |
To |
Intercept |
|||||
KDI-14-040 |
Kelvin |
70 |
-62 |
81.40 |
105.70 |
24.30 |
115 |
KDI-14-041 |
Kelvin |
70 |
-75 |
105.50 |
191.00* |
77.00 |
205 |
KDI-14-042 |
Kelvin |
250 |
-62 |
85.20 |
149.30* |
62.70 |
160 |
KDI-14-043 |
Kelvin |
250 |
-75 |
143.30 |
213.40* |
54.50 |
229 |
KDI-14-044 |
Kelvin |
75 |
-65 |
205.20 |
294.80* |
76.20 |
349 |
KDI-14-045 |
Kelvin |
75 |
-75 |
289.70 |
320.40 |
30.70 |
376 |
*Includes minor country rock intercepts
**Not true widths
Table 3 below details the latest exploration holes drilled to define the down-dip of the Kelvin dyke.
Table 3
Kelvin 2014 Summer Exploration Drill Program
Drill Hole |
Target |
Azimuth |
Inclination |
Kimberlite Intercepts (m) Approximate |
End of |
||
From |
To |
Intercept |
|||||
KDI-14-046 |
Kelvin |
130 |
-90 |
220.80 |
229.10* |
5.10 |
275 |
KDI-14-048 |
Kelvin |
130 |
-65 |
147.60 |
150.80 |
3.20 |
205 |
*Includes minor country rock intercepts
**Not true widths
Following the mobilization of a third drill rig, drilling at the Kennady North project has advanced rapidly with the result that the estimate for the summer drill program has been increased to approximately 12,000 meters. The focus remains on delineation, exploration and mini-bulk sample drilling at the Kelvin and Faraday kimberlites, as well as exploration drilling at the MZ and Doyle kimberlites and at least four new exploration targets.
To define the down-dip to the northwest of the Kelvin kimberlite dyke a "fence" of holes is being drilled from northeast to southwest along the western shore of Kelvin Lake. Past ice-based drilling of the Kelvin dyke has returned kimberlite intercepts ranging from a few meters to over 20 meters. If the current drill program is successful is proving continuity of the dyke to depth, the potential exists for considerable additional tonnage at the Kelvin kimberlite.
To date, approximately 14.8 tonnes of kimberlite has been recovered from Kelvin. This is in addition to the 25 tonnes recovered from Kelvin during last spring's drill program. The 25 tonne mini-bulk sample is currently being processing at the Geoanalytical Laboratories Diamond Services of the Saskatchewan Research Council ("SRC"). Results from the Kelvin mini-bulk sample are expected early in the fourth quarter of 2014.
****
About Kennady Diamonds
Kennady Diamonds Inc. controls 100 percent of the Kennady North diamond project located immediately to the north, west and south of the Gahcho Kué diamond mine currently under development by De Beers and Mountain Province Diamonds.
Kennady Diamonds aims to identify a resource along the Kelvin – Faraday kimberlite corridor of between 7 and 10 million tonnes and also to identify new kimberlites outside of the corridor. This tonnage estimate is based on the drilling completed to date. The potential quantity is conceptual in nature as there has been insufficient drilling to define a mineral resource and it is uncertain if further exploration will result in the target being delineated as a mineral resource.
An 8,500 meter drill program conducted in 2013 returned exceptional sample grades. A 4.3 tonne sample from the Kelvin kimberlite retuned a grade of 5.38 carats per tonne. An approx. one tonne sample from the Faraday kimberlite returned a sample grade of 5.10 carats per tonne. The three largest diamonds recovered from the Kelvin kimberlite were a 2.48 carat off-white transparent octahedral, 1.06 carat off-white broken aggregate and a 0.90 carat off-white transparent irregular. The recovery of diamonds of this size and quality from a 4.3 tonne sample is very encouraging.
...........................